Take a look at some of our recent projects, showcasing our expertise and commitment to delivering high-quality results. From concept to completion, our team has worked tirelessly to bring these projects to life, and we’re proud to share them with you
May 2025 – Feb 2026: JRA/25/03 – Conversion of Open Drains to Underground Stormwater Management in Orange
Farm Region G – Palm Drive
URANUS Consulting Engineers
Value of work: +/-R35 Million
Client: Johannesburg Roads Agency (JRA)
- Conversion of open drains to underground stormwater management.
- Removal of old culverts that don’t meet the specification’s, excavation and installation of 1500x1800mm culverts for 1km
- Installation of new road crossings, 600mm diameter pipes with Ki,s 150m length
- Pioneer layer on water logged areas implementation for 450m
- Relocation of Eskom Power lines due to design alignment
Project Responsibilities: Quality control of construction works, Checking Certify monthly claims, issuing. Job Instructions, Site Inspections & work approvals.
Feb 2025 – December 2025: NRA.X002-097-2019/1 – Routine Road Maintenance of Route N11 from Msukaligwa border to
Ermelo, N11 Section 8 from Ermelo to the Msukaligwa Border and the N2 from Ermelo to the
Msukaligwa Municipal Border. (Emergency Project)
ROMH Consulting Engineers
Value of work: +/-R165 Million
Client: South African National Roads Agency Limited (SANRAL)
Construction & upgrade of R36-1, between Ermelo to Carolina. Road Rehabilitation: Mill & Replace with BTB 110mm, Medium, continuously graded, 40mm Asphalt, Shoulder construction, Road Markings to SANRAL specification, Guardrails installation, Concrete Lined drains 2m wide by 1km, maintenance of existing structures: pipe culverts, concrete drains, grass cutting, tree cutting, replace fence lines.
Project Responsibilities: Quality control of construction works, Checking Certify monthly claims, issuing Job Instructions, Site Inspections & work approvals
Apr 2024 – Jan 2025: Turnkey Engineering Service for the Drainage System Upgrade, Embankment, Stream works and
Railway Works with Formation Rehabilitation Between Parkhill & Wadeville Station
RE A LETAMISA Construction
Value of work: +/-R95 Million
Client: Passenger Rail Agency South Africa (PRASA)
Construction & upgrade of a railway line between Parkhill & Wadeville stations, the work entailed box cutting existing formation, Construction of the S410 design which entailed, construction of a pioneer layer 0.5m deep, 2 x 150mm layer of g7, 2 x150m layers of G5, 300mm layer of ballast & P2 type concrete Sleepers & installing rails (48kg/m) specification. Embankment protection done using gabion baskets on unstable slopes, 500m length x 3m height x 2.5m width.
Project Responsibilities: Programming of works, weekly Schedules, Technical support to site supervisors per section, ensuring quality control of construction works, submission of monthly claims & payment certificates to the client.
Apr 2023 – Mar 2024: Bulk Stormwater Upgrade Of Bond Street, Ferndale Between Pine Avenue and Vine Avenue,
Phase 2, Randburg, Region B, City Of Johannesburg
ROMH Consulting Engineers
Value of work: +/-R18 Million
Client: Johannesburg Roads Agency
Construction of a Bulk Stormwater system between Pine Avenue & Vine Avenue, bulk excavations of 400mx 4m depth x 3m wide, installation of 2100 x 1800 box culverts, 600mm Storm water pipe road crossings. Construction of manholes and KI,s along bond street. De-Silting of existing culverts installed in phase 1.
Project Responsibilities: Drawings Design review, drawings interpretation for the site team for support, programme of works monitoring, quality control, sequencing of works, monthly report to the PMU Department and approvals for completed works.
July 2022 – Feb 2023: onstruction of Water Treatment Plant, Nhlazatshe Road Construction Ward 24
Sindane Mining Ventures
Value of work: +/-R21 Million
Client: African Rainbow Minerals / Chief Albert Luthuli Local Municipality
African Rainbow Minerals (ARM) – Construction of water treatment plant, Bulk Excavations, Backfilling with suitable material G5 Slag & G6. Construction of Main Sump, Filter Press, Workshop Steel Structure & roof sheeting, with Cladding.
Nhlazatshe – Upgrading of gravel road to Block paved road, Road layers: In-Situ rip & compact, Subbase G7, Base G5 (C4), Block Paving 80mm grey bevelled edge. Storm water pipes 900mm, Concrete Lined
V-drains
June 2021 – June 2022: Construction of Mqanduli DLTC & Upgrading & Rehabilitation of Internal Roads in Dutywa:
LEKO Consulting Engineers
Value of work: +/-R45 Million
Client: Office of The Premiere (Eastern Cape Province)
Bulk Excavations for the (Department of Licence & Traffic Centre) DLTC facility +/- 35000m3 of material to be removed, Storm water pipes 600mm installed along the boundary of the facility +/-200m in total length. G7, Road bed, G6 Subbase layer & G5 Base layer Dutywa Road Rehabilitation, Installation of new storm water control on existing roads, patching potholes, upgrade road ways, construction of new walkways on densely populated roads e.g. schools, hospitals, Taxi/ bus ranks. New seals to be done on al roads, road markings & new road signs.
October 2020 – May 2021:
Construction Of Bhekumuzi Masango Drive (Phase1):
LEKO Consulting Engineers
Value of work: +/-R15 Million
Client: Emakhazeni Local Municipality (E.L.M)
Rehabilitation of Bhekumuzi Masango Drive in Belfast, Reconstruction of layer works between km0 – km220, wetland between km220 – km640, reconstruction of Layerworks between km 640 – km 1100.
Wetland: schedule: Unselected dump rock +/- 500mm, selected dump rock (drainage layer) =/- 300mm of selected dump rock 100-250mm. selected layer 150mm, Subbase C4 250mm, Base G2 150mm, Asphalt 40mm Continuously Graded. Kerb and channel and barrier kerbs to be installed, 600mm SW pipes
crossing main road & 450mm storm water pipes at intersections, 2 x 450mm x 450mm culverts at lowest point to ensure proper drainage at wetland section.
Project Responsibilities: Drawings Design review, drawings interpretation for the site team to support/ assist the Site Agent, programme of works monitoring, quality control, sequencing of works, monthly report to the PMU Management & Municipality Manager.
May 2020 – 2021: External Lecturer/ Moderator
Value of work: +/- R500 000.00
Client: UNISA
Lecturer at UNISA (Florida Campus) Civil and Chemical Engineering Department.
My roles were as follows:
- TST1501 (Theory of Structures I), Main Lecturer, student’s assessments, setting the exam and marking, issuing practical’s and assignments
- DRW 1501 (Drawing I), Secondary Lecturer, marking student’s assignments, invigilating using IRIS software, moderating student’s marks.
- SUR 1501 (Survey I), Secondary Lecturer, Tutorial letters signing, moderation of semester calendar
- CNTPRA4 (Concrete Technology IV Prac), Assisting main lecture with marking students practical’s and uploading onto J-router
July 2017 – 2020: Construction Of BRT Selby Depot: Phase 2B:
HHO Consulting Engineers
Value of work: +/-R150 Million
Client: JDA
Reconstruction of a bus parking facility, workshop area, wash bay facility, Refuel bay & gate house As a Resident Engineer my responsibilities entail the Management and supervision of construction works.
Reconstruction of a bus parking facility, boundary wall, external street parking,
the construction of a traffic Circle, installation of new traffic signs and safety enhancement.
Project Responsibilities: entail the Management and supervision of construction works, design review and changes and approvals for completed works.
April 2016 – July 2016: Redevelopment of M2 (NOBUHLE) Hostel – Phase 3 Alexandra Renewal: Site Manager
Value Of Work: +/-R100 Million
Client: Department of Human Settlements
Renovations of Nobuhle Hostel to family units, three (3) blocks: Block A6, A10 & B6, with a total of 300 units to be done.
Project Responsibilities: entailed the following: Quality Management process implementation, monitoring, supervision and Assessment of progress and fast tracking renovation work to meet construction Specifications Daily site diaries, Quantity measurements for certificate claim
March 2015 – April 2016: LEHAE Transport Facility, JHB Zoo internal Roads & Diepsloot Agricultural Farm: Contracts
Manager
Value of works: +/- R25 Million
Client: Johannesburg Roads Agency
Construction public transport facility in Lehae, which is meant to accommodate buses, taxis & nonmotorised transport,
JHB Zoo internal roads: reconstruction of two (2) access roads and parking area, with paving 80mm heavy duty paving blocks.
Agricultural Farm: entailed the construction of two (2) major structures, warehouse storage facility and operations facility for the farmers to package their produce for distribution. Project Responsibilities: Management & Planning for, Construction works, producing work programmes, Projects Cash Flow projections Payment certificate claims, monitoring & MS Projects Programming, monitoring
November 2013 – March 2015: Refurbishment and Replacement of AC & Steel Water Pipes, Aged Connections and Water meters
in Rustenburg: SMEC Consulting Engineers
Value of work: +/-R17 Million
Client: Rustenburg Local Municipalty
Construction of three (3) major chambers for bulk lines (315,300& 250mm) pipes, installation of new stop valves, pressure release valves, air valves & water meters. Replacing of old Asbestos pipes with Upvc class 9 & HDPE class 16 pipes for Rustenburg CBD.
Project Responsibilities: Management and supervision of construction works,
October 2013 – Nov 2013:
Water Demand Management in Rustenburg
SMEC Consulting Engineers
Value of work: +/- 10 Million
Client: Rustenburg Local Municipality (RLM)
Assessment and checking of the top 100 consumers of water in the Rustenburg
area and also investigating water usage in schools and surrounding areas.
Producing and compiling tender documentation checking relevant specs BOQ
Items required for the project; documents issued for tender submissions.
December 2011 – April 2013: Rail Formation Rehabilitation and Drainage Upgrade (Limindlela to Tembisa) Cluster B and
(Kliptown to Tshiawelo) Cluster C:
GOBA Consulting Engineers
Value of work: +/- 42 Million
Client: Passenger Rail Agency South Africa (PRASA)
Removal of existing railway tracks ballast & sleepers for the Reconstruction of the formation (layer works) +/- 1.3m depth, Removal of existing clay material and replacing with dump rock 250mm, ballast 200mm Subgrade 450mm, subbase 250mm and 200mm final layer, placing and lining of sleepers, replacing the rail (57kg/m) on to concrete sleepers. Construction of subsoil drains along the railway line 2.6km section and construction of surface drains (u-drains).
Project Responsibilities: Management, supervision quality control of construction works, verify claims & payment certificates.
June 2008 – November 2011: Upgrading of the N3 freeway between Geldenhuys I/Ch to Buccleuch (Km 25 – 42,6):
GOBA Consulting Engineers
Value of work: +/- 1 Billion
Client: South African National Roads Agency Ltd (SANRAL)
Rehabilitation and the upgrade on N3 freeway. Placing 230mm of concrete, 20mm steel bars of steel used in 2 lanes for heavies, additional traffic lanes constructed to accommodate traffic, widening on & off
ramps, quick hardening concrete used for 24hr strength of 30mpa to be achieved for re-opening of lanes to traffic.
Project Responsibilities: Services: handling relocation of services and liaison between service agencies and contractor for location & relocation of all services. Concrete (CRCP): monitoring & managing the section between Gillooly’s interchange & Geldenhuys section, inspection of all milling works depth & widths, Fastening of steel, construction joints positions & details if done correctly done and splicing joints, not more than 30% at the same section. Statical analysis for all concrete works and as-built drawings
October 2006 – May 2008: Construction of a new road between Kleinmier and Grootmier (Km 0 – 22.5): GOBA Consulting Engineers
Value of work: +/- 94 Million
Client: Department Of Transport – Northern Cape (DOT)
Construction of a new road through sand dunes towards Namibia border gate, Sub-base (G6), Base Course natural calcrete material crushed to at least 50mm (G4), side-drains with 900X900 box culverts,
double seal, Construction of a new gravel link road 2.4Km.
Project Responsibilities: inspection of survey works, inspection of works for approval, reporting to the R.E on daily activities and monitoring construction works
January 2005 – February 2006: Rehabilitation of National Route N11, Section: One tree hill (Km 13.4) to MR 35 (Km 36.1)
(Newcastle):
Raubex Construction
Value of work: +/- 65 Million
Client: South African National Roads Agency Ltd (SANRAL)
Sub-base (C4) cement stabilized and base course (G1) crusher run, v-drains with Sub-soil drains, 900mm storm water pipes, 30mm premix, 20mm ultra-thin friction course seal surface finish (UTFC), shifting of the road center line 300mm to accommodate widening of lanes in section
December 2003 – January 2005: Construction the Umtata River Bridge and Link Road between Mqanduli & Ngqeleni (Mthatha):
Raubex Construction
Value of work: +/- 31 Million
Client: Department Of Transport
Checking levels and positions of a 100m bridge with 5 spans, each span 20m and 30km gravel/ dirt road with 6 cast in situ box culverts, 900mm storm pipes, side-drains with concrete works.